CF&S has contributed to the construction of Paldiski wind farm, which was completed in 2012 on the Pakri Peninsula. We took care of the transportation of 18 mills, as well as the associated port operations. The mast height of the wind turbine is 85 meters, the rotor diameter is 100 m and the wind turbine weighs 309 tons.
CF&S has contributed to the construction of Paldiski wind farm, which was completed in 2012 on the Pakri Peninsula. We took care of the transportation of 18 mills, as well as the associated port operations. The mast height of the wind turbine is 85 meters, the rotor diameter is 100 m and the wind turbine weighs 309 tons.